Wallerawang Power Station
Decommissioned thermal coal power station near Wallerawang, Australia / From Wikipedia, the free encyclopedia
Dear Wikiwand AI, let's keep it short by simply answering these key questions:
Can you list the top facts and stats about Wallerawang Power Station?
Summarize this article for a 10 year old
Wallerawang Power Station was a thermal coal power station, located near Wallerawang, in the Central Tablelands region of New South Wales, Australia. The power station was equipped with two turbo-alternators of 500 megawatts (670,000 hp) each, supplied by CA Parsons and Company of Newcastle-upon-Tyne, England. Production commenced in May 1957.[1]
Wallerawang Power Station | |
---|---|
Country | Australia |
Location | Wallerawang, New South Wales |
Coordinates | 33°24′14″S 150°5′4″E |
Status | Decommissioned |
Commission date | May 1957; 67 years ago (1957-05) (A) 1961; 63 years ago (1961) (B) 1976; 48 years ago (1976) (C) |
Decommission date | January 2013; 11 years ago (2013-01) (A) April 2014; 10 years ago (2014-04) (B) November 2014; 9 years ago (2014-11) (C) |
Owner(s) | EnergyAustralia |
Thermal power station | |
Primary fuel | Thermal coal |
Power generation | |
Units operational | 2 |
Make and model | CA Parsons and Company |
Nameplate capacity | 1,000 megawatts (1,300,000 hp) |
External links | |
Website | Mt Piper & Wallerawang Power Stations at www.energyaustralia.com.au |
Commons | Related media on Commons |
In July 2013, EnergyAustralia acquired Wallerawang Power Station, along with Mount Piper Power Station, from Delta Electricity for $160 million.[2] Due to dwindling demand, the first of the two generating units had been mothballed in January 2013, and the second in April 2014. In November 2014, EnergyAustralia announced that it would permanently close Wallerawang due to ongoing reduced energy demand, lack of access to competitively priced coal and the power station's high operating costs.[3] EnergyAustralia began the process of removing useful equipment from the station in 2015.[4][5] The plant was finally demolished in 2021 using controlled demolition.[6]