Santiago Metro Line 7
Under-planning Santiago Metro line / From Wikipedia, the free encyclopedia
Dear Wikiwand AI, let's keep it short by simply answering these key questions:
Can you list the top facts and stats about Santiago Metro Line 7?
Summarize this article for a 10 year old
SHOW ALL QUESTIONS
Line 7 is a new rapid transit line due to open on the Santiago Metro, in 2027. Intended to relieve the busy Line 1, the Line 7 will start in Renca in the northwest, passing through the city center, before ending in the borders of Las Condes and Vitacura in the northeast. Expected to be finished by 2028, it will add 19 new stations and 24.8 km (15.4 mi) of track to the system. Its distinctive color on the network line map is gray. Cost of construction has been set at $2.5 billion USD.[2]
Quick Facts Overview, Status ...
Santiago Metro Line 7 | |||
---|---|---|---|
Overview | |||
Status | Under construction | ||
Owner | Empresa de Transporte de Pasajeros Metro S.A. | ||
Locale | Santiago | ||
Termini |
| ||
Stations | 19 | ||
Service | |||
Type | Rapid transit | ||
System | Santiago Metro, Transantiago | ||
Services | 1 | ||
Operator(s) | Empresa de Transporte de Pasajeros Metro S.A. | ||
History | |||
Planned opening | 2028[1] | ||
Technical | |||
Line length | 24.8 km (15.4 mi) | ||
Character | Underground | ||
Electrification | 1,500 V DC overhead catenary | ||
|
Close