Rublyovo-Arkhangelskaya line
Planned line of Moscow Metro / From Wikipedia, the free encyclopedia
Rublyovo-Arkhangelskaya line (Russian: Рублёво-Архангельская линия) or Line 17 of the Moscow Metro is currently under construction. It began in 2021 and will end after 2028, opening in two phases.[1][2] Phase 1 is scheduled to be completed by 2026-2027 completing the section from Delevoy Tsentr to Lipovaya Roscha station and phase two is scheduled to open after 2028 expanding the line from Lipovaya Roscha to Ilyinskaya station. In the future it will be connected with Biryulyovskaya line.[3]
Quick Facts Overview, Native name ...
Rublyovo-Arkhangelskaya line | |
---|---|
Overview | |
Native name | Рублёво-Архангельская линия |
Locale | Moscow |
Stations | 10 |
Service | |
Type | Rapid transit |
System | Moscow Metro |
Operator(s) | Moskovsky Metropoliten |
Technical | |
Line length | 18.7 kilometres (11.6 mi) |
Character | Underground |
Track gauge | 1,520 mm (4 ft 11+27⁄32 in) |
Electrification | Third rail |
Close