Expressway S1 or express road S1 is a Polish highway under construction with a planned length of 130 km (81 mi), in the Silesian and Lesser Poland voivodeships. Upon completion, it will connect the A1 motorway near the Katowice International Airport in Pyrzowice, with the border of Slovakia in Zwardoń, where it will connect to the D3 Motorway. The route is expected to be completed in late 2025.[1]
Expressway S1 | ||||
---|---|---|---|---|
Droga ekspresowa S1 | ||||
Route information | ||||
Part of E75 | ||||
Maintained by GDDKiA | ||||
Length | 93.1 km (57.8 mi) 132.81 km (82.52 mi) planned | |||
Major junctions | ||||
From | A1 near Katowice International Airport in Pyrzowice | |||
Major intersections | 86 near Podwarpie 94 in Dąbrowa Górnicza | |||
To | D3 motorway, border with Slovakia | |||
Location | ||||
Country | Poland | |||
Major cities | Dąbrowa Górnicza, Sosnowiec, Mysłowice, Tychy, Bielsko-Biała, Żywiec | |||
Highway system | ||||
|
The section from A1 motorway to A4 motorway and further to Tychy is open to traffic, but the fragment in Dąbrowa Górnicza (7 km) is under reconstruction to modern standard, set to be finished in the 2nd half of 2024. For the time of reconstruction, only one lane per direction is open to traffic. This route forms the Eastern beltway of the Upper Silesian Industrial Region.
From Tychy to Bielsko-Biała, the existing dual-carriageway national road 1 serves the traffic. New parallel expressway route is under construction, planned to be finished in late 2025 or early 2026.
From Bielsko-Biała to Żywiec, the expressway is completed. The section from Żywiec to the Slovak border in Zwardoń is a single-carriageway expressway, which is partially completed and partially under construction, set to be finished in the 2nd half of 2025.