Desert Sunlight Solar Farm
Photovoltaic power station in California / From Wikipedia, the free encyclopedia
Dear Wikiwand AI, let's keep it short by simply answering these key questions:
Can you list the top facts and stats about Desert Sunlight Solar Farm?
Summarize this article for a 10 year old
SHOW ALL QUESTIONS
The Desert Sunlight Solar Farm is a 550-megawatt (MWAC) photovoltaic power station approximately six miles north of Desert Center, California, United States, in the Mojave Desert. It uses approximately 8.8 million cadmium telluride modules made by the US thin-film manufacturer First Solar. It has the same 550 MW installed capacity as the Topaz Solar Farm in the Carrizo Plain region of Central California, making both of them tied for the second largest completed solar plants by installed capacity as of fall 2015.[1][2]
Quick Facts Country, Location ...
Desert Sunlight Solar Farm | |
---|---|
Country | United States |
Location | Riverside County, California |
Coordinates | 33°49′17″N 115°23′38″W |
Status | Operational |
Construction began | 2011 |
Commission date | 2015 |
Owner(s) | NextEra Energy Resources, GE Energy Financial Services, Sumitomo Group |
Solar farm | |
Type | Flat-panel PV fixed tilt |
Site area | 3,900 acres (1,600 ha) |
Power generation | |
Nameplate capacity | 550 MWAC |
Capacity factor | 27.5% (average 2015-2018) |
Annual net output | 1,325 GW·h, 340 MW·h/acre |
External links | |
Website | firstsolar.com |
Close