Launch vehicle system tests
Preparation procedures for verifying carrier rocket performance / From Wikipedia, the free encyclopedia
Dear Wikiwand AI, let's keep it short by simply answering these key questions:
Can you list the top facts and stats about Static fire?
Summarize this article for a 10 year old
Launch vehicle system tests assess the readiness of a launch system to safely reach orbit. Launch vehicles undergo system tests before they launch. Wet dress rehearsals (WDR) and more extensive static fire tests prepare fully assembled launch vehicles and their associated ground support equipment (GSE) prior to launch. The spacecraft/payload may or may not be attached to the launch vehicle during the WDR or static fire, but sufficient elements of the rocket and all relevant ground support equipment are in place to help verify that the rocket is ready for flight.
The examples and perspective in this article may not represent a worldwide view of the subject. (July 2021) |
Propellant load tests and static fire tests may also be done on prototype rocket stages, in which case no fully assembled launch vehicle is involved, as is the case of the SpaceX Starship stages, the booster Super Heavy and the second stage Starship.