The Howrah–Prayagraj–Mumbai line, (formerly known as Howrah–Allahabad–Mumbai line) [importance?] is a railway line connecting Kolkata and Mumbai via Prayagraj (formerly Allahabad). The 2,160-kilometre long (1,340 mi) railway line was opened to traffic in 1870. This railway line was 2,146-kilometre long (1,333 mi) until 2004. In 2004 the construction of Indira Sagar Dam submerged the old alignment near Khandwa & a new alignment of 14-kilometre long (8.7 mi) was relaid.
Quick Facts Overview, Status ...
Howrah–Prayagraj–Mumbai line |
---|
Jabalpur Junction an important railway station on Howrah–Prayagraj–Mumbai line |
|
Status | Operational |
---|
Owner | Indian Railways |
---|
Locale | West Bengal, Jharkhand, Bihar, Uttar Pradesh, Madhya Pradesh, Maharashtra |
---|
Termini | |
---|
Website | |
---|
|
System | Fully electrified |
---|
Operator(s) | Eastern Railway, East Central Railway, North Central Railway, West Central Railway, Central Railway |
---|
Depot(s) | Kalyan Junction railway station, Bhusawal, Itarsi Junction railway station, Katni |
---|
|
Opened | 1870 |
---|
|
Line length | Since 2004 2,160 km (1,342 mi). Before 2004 2,146 km (1,333 mi) |
---|
Number of tracks | 4 in Bardhaman–Asansol section & Kalyan–Mumbai CST section
3 in Howrah–Bardhaman chord, Gaya–Pandit Deen Dayal Upadhyaya Junction section, Pandit Deen Dayal Upadhyaya Junction-Prayagraj section & Bhusawal–Kalyan section 2 in Asansol–Gaya section, Prayagraj–Jabalpur section & Jabalpur–Bhusaval section |
---|
Track gauge | 1,676 mm (5 ft 6 in) |
---|
Electrification | Fully electrified |
---|
Operating speed | up to 130 km/h (81 mph) |
---|
Highest elevation | Lowest at Howrah 8 metres (26 ft) (approx). Highest at Thull Ghats 1,849 feet (564 m) (approx) |
---|
Route map |
---|
|
|
|
|
km |
|
|
|
|
2,177 |
Mumbai CST |
|
|
|
|
|
|
|
|
2,168 |
Dadar |
|
|
|
|
Kurla |
|
|
|
|
Lokmanya Tilak Terminus |
|
|
|
2,124 |
Kalyan Junction |
|
|
|
1,990 |
Nasik Road |
|
|
|
1,917 |
Manmad Junction |
|
|
|
|
|
|
|
|
1,733 |
Bhusaval Junction |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
to Akola |
|
|
|
1,609 |
Khandwa Junction |
|
|
|
|
to Ujjain |
|
|
|
|
|
|
|
|
1,426 |
Itarsi Junction |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
to Nainpur |
|
|
|
|
|
|
|
|
1,180 |
Jabalpur Junction |
|
|
|
|
to Guna |
|
|
|
1,090 |
Katni Junction |
|
|
|
|
|
|
|
|
|
|
|
|
|
991 |
Satna |
|
|
|
|
|
|
|
|
|
|
|
|
|
821 |
Prayagraj (Allahabad) |
|
|
|
|
|
|
|
|
|
Naini |
|
|
|
|
|
|
|
|
|
Chheoki |
|
|
|
|
to Varanasi |
|
|
|
661 |
Mughalsarai |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
458 |
Gaya Junction |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
259 |
Dhanbad Junction |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
95 |
Barddhaman |
|
|
|
|
|
|
|
|
0 |
Howrah Junction |
|
|
|
km |
|
Source: Indian Railway Time Table |
|
|
|
|
|
|
|
|
|
|
Close