Antequera–Granada high-speed rail line
From Wikipedia, the free encyclopedia
The Antequera–Granada high-speed rail line opened in 2019, linking the Spanish city of Granada to the AVE network via a branch from the existing Madrid–Málaga high-speed rail line at Antequera.
Quick Facts Overview, Status ...
Antequera–Granada high-speed rail line | |
---|---|
Overview | |
Status | Operational |
Owner | Adif |
Locale | Spain (Andalucia) |
Termini | |
Service | |
Type | High-speed rail |
Operator(s) | Renfe Operadora |
Ridership | 634,000 (2019-20)[1] |
History | |
Opened | 26 June 2019 |
Technical | |
Line length | 125.7 km (78.1 mi) |
Number of tracks | Double track |
Track gauge | Dual gauge (1,435 mm (4 ft 8+1⁄2 in) standard gauge 1,668 mm (5 ft 5+21⁄32 in) |
Electrification | 25 kV 50 Hz |
Operating speed | max 300 km/h (190 mph) |
Close